cases

Xiamen Hospital of Traditional Chinese Medicine Phase II Project

Release time :2024-01-05 15:50:53   Views:
Project start time: 2022-01-17 onwards
Project Location: No. 1739, Xianyue Road, Huli District, Xiamen City, Fujian Province
BIM implementation scope: full-area application (basement, above-ground part of the medical area and medical supporting area, outpatient medical technology, inpatient, basement and other functional buildings)

Project Overview: The launch of the second phase of the project of Xiamen Hospital of Traditional Chinese Medicine will double the medical construction area of Xiamen Hospital of Traditional Chinese Medicine compared with the current one, promote the major adjustment and improvement of the hospital's business layout and structure, and boost the hospital to enter the fast lane of high-quality development, so as to comprehensively improve the overall service capacity of the hospital and meet the growing health needs of the people.
BIM application points: full-professional modeling, drawing review, net height verification, net height analysis, comprehensive pipeline layout, fine decoration drawing verification, etc.

Project Scale:
Project area: 40283.56m2


1. BIM model
(Above-ground local model)

 
2. Design stage
The construction drawings are checked and filled>>
Check and fill in the gaps in the existing drawings, negotiate with the design institute to modify, and avoid later rework
 
Problem 1: The position of the patient passage on 5F, the floor height is 4500, the structural drop plate is 400, the beam height is 800, the net height under the beam is 3250, and the net height under the ceiling is 1230 after the comprehensive layout of the pipeline
 
(Before)
(Revised)

 
Problem 2: The location of the sump in the building and structure plan at the V-axis of the intersection at 10 is inconsistent
 
(Before)
(Revised)

 
Optimization >> of pipe comprehensive
Carry out the optimization of the comprehensive design of the mechanical and electrical pipes, improve the quality of construction drawings, and issue positioning drawings and models such as three-dimensional views and horizontal sections, so as to prepare for the next step of on-site construction