cases

China SCE • Nan'an Funworld BIM project

Release time :2024-01-05 13:55:32   Views:

The Nan'an SCE World City project aims to build an important urban "new center" in Nan'an, covering five mainstream business formats, including shopping malls, Fortune Gold Street, hardcover SOHO, five-star hotels and 5A office buildings. It is the largest commercial complex integrating shopping, catering, entertainment, leisure and business in the eastern part of Quanzhou. It is precisely because of its pursuit of excellence in quality and the recognition of the industry-leading strength of Bimodeling that China SCE Nan'an World City chose Bimodeling. BIM technology is used to carry out virtual design and construction in the design stage, to identify design deficiencies and avoid possible construction obstacles.

For the SCE Nan'an World City project,Bimodeling uses "Revit" modeling technology and "Civil 3D" software to coordinate with each other. Establish a full-discipline model for the project, analyze and simulate from multiple aspects, optimize the spatial structure, improve the design scheme, and shorten the construction period.
(Architectural Model Drawing)

Functions can be achieved
1. Survey: Import the original survey data, least squares adjustment, edit the survey data, and automatically create survey drawings and surfaces.
2. Surface and Grading: Generate a surface model for any slope type with daylight and grading projection tools
3. Plot Layout: Automate the process by converting existing AutoCAD entities or generating plots using flexible layout tools.
4. Road Modeling: Combine horizontal and vertical geometry with custom cross-sectional components to create parametrically defined, dynamic three-dimensional models of highways and other transportation systems.
5. Plumbing: Use rule-based tools to lay out domestic water and stormwater drainage systems. Graphical or digital input can be used to truncate or connect existing pipe networks or to change pipes and structures for collision checking.
6. Earthwork calculation: Use the composite volume algorithm or the average section algorithm to calculate the earthwork between the existing surface and the design surface more quickly.


Pros of Revit:
1. Use Revit to export the three-dimensional design size and volume data of each building component to provide information for budget estimates, and the accuracy of the data is proportional to the accuracy of modeling;
2. On the basis of accurate modeling, the flat drawings generated by Revit modeling are completely matched, and the quality of the drawings is very little affected by human factors;
3. Other software solves a professional problem, while Revit can solve multi-disciplinary problems. Revit not only has architecture, structure, equipment, but also collaboration, remote collaboration, rendering with material input to 3DMAX, cloud rendering, collision analysis, green building analysis and other functions;
4. Powerful linkage function, two-way association of flat, vertical, section and schedule, modify in one place, update everywhere, and automatically avoid low-level errors;
5. Revit design will save costs, reduce design changes, and speed up the project cycle.
(Electromechanical model of the project)
(Electromechanical model of the project)
 
Baidu
sogou