cases

Xiang'an Tunnel Roof Sewage Pump BIM Project

Release time :2024-01-05 13:35:03   Views:
Xiamen Xiang'an undersea tunnel, with a total length of 8.695 kilometers, from Xiamen to the mainland end of the opposite shore, saving 82 minutes and more than the original, on April 26, 2010, the first Xiamen Xiang'an undersea tunnel in Chinese mainland was completed and opened to traffic, the two-way six-lane Xiamen Xiang'an undersea tunnel channel is the fifth passage in and out of the island of Xiamen Peninsula, with dual functions of highway and urban road, its completion and opening to traffic makes Xiamen enter and exit the island to form an all-weather three-dimensional traffic pattern from the sea to the seabed.
Bimodeling participated in the BIM project of the sewage pump on the roof of the Xiang'an Tunnel in the New Town of Huandong Sea.

The construction started in November 2017 with a total building area of 252.08 square meters.
Bimodeling uses advanced BIM technology to carry out a comprehensive, controllable and visual simulation of the project, which greatly reduces the cost of the project.



Baidu
sogou